  • The client on this project was Mark Hall Academy.
  • This was completed within a 10 week time scale.
  • This project involved the careful removal and disposal of the existing 8 lane track top surface, minor localised repairs to the base mat and events such as shot put, cleaning of the drainage system.
  • Approximately, the project came to the value of £280,000.00+ VAT.
  • We installed a new Hercluan SR Sprint flood coat in red to the existing track with new painted line marking.