• The client on this project was Malborough College.
  • This was completed within a 8 week timescale.
  • This project involved a structural re-spray of the existing 8 lane track.
  • Approximately, the project came to the value of £150,000.00+ VAT.
  • We installed the Herculan National porous system in red with painted line markings.
  • Additional items were provided such as installation of a new throwing cage.
  •  