Marlborough College
- The client on this project was Malborough College.
- This was completed within a 8 week timescale.
- This project involved a structural re-spray of the existing 8 lane track.
- Approximately, the project came to the value of £150,000.00+ VAT.
- We installed the Herculan National porous system in red with painted line markings.
- Additional items were provided such as installation of a new throwing cage.