• The client on this project was Oldham Community Leisure.
  • The area of this was an 8 lane track with an 8 lane straight.
  • Approximately, the project came to the value of £225,000.00+ VAT.
  • We installed a new Hercluan SR flood coat to the existing track with new line marking.
  • Improvements to the events were carried out to bring them up to standard.
  • Minor repairs were carried out to the track and D.
  •  