• The client on this project was Basford United FC.
  • The area of the pitch was 7942m2 with a 50mm pile 3G sand/rubber filled carpet including line markings for one Community Football pitch.
  • All works were completed within a 13 week timescale with no delays.
  • Approximately, the project came to the value of £558,865.00+ VAT.
  • This was a brand new construction on an existing grassed football pitch, so a full installation was required including type 1 x stone and macadam.
  • A full construction was required, the extent of which included excavations, installation of the drainage, sub base and kerbs.
  •  
  • A refurbishment fencing scheme consisted of 372.00m of 1.20m high super rebound 8/6/8 twin bar spectator fencing, 3 no. 1.20m wide x 1.20m high single leaf gates, 2 no. 3.00m wide 1.20m high pair of double leaf gates and 2 no. 30m of 5.00m high standalone 100x100mm ball stop netting.
  • A refurbishment of the existing floodlighting existed of a six column, 200 lux floodlighting scheme.
  • Additionally, new sets of football goals were erected to complete the installation, litter bins, boot wipers and a set of 6 flags.