• The client on this project was Dorset County FA.
  • The area of the pitch was 7420m2 with a 50mm pile 3G sand/rubber filled carpet including line markings Football.
  • All works were completed within a 13 week timescale with no delays.
  •  Approximately, the project came to the value of £509,245.00+ VAT.
  •  This was a brand new construction on an existing grassed football pitch, so a full installation was required including type 1 x stone and macadam.
  •  A full construction was required, the extent of which included excavations, installation of the drainage, sub base and kerbs.
  • A new fencing scheme consisting of 2m high super rebound twin bar fencing,  1.20m high super rebound 8/6/8 twin bar spectator fencing, 3 no. 1.20m wide x 1.20m high single leaf gates and 3 no. 3.00m wide 1.20m high double leaf gates.
     Some description
  • New floodlighting consisting of a eight column, 200 lux floodlighting scheme.
  • Additionally, new sets of football goals were erected to complete the installation, plus team shelters litter bins, boot wipers and a set of 6 flags.