• The client on this project was ESH Construction Ltd, on behalf of Sunderland City Council.
  • This was a multi pitch parklife project with 3no. full sized 106 x 70m football pitches. The total area was 22,260m2 excluding hardstandings.
  • All works were completed in a 25 week timescale.
  • Approximately, the project came to the value of £2,000,000.00+ VAT.
  • This project required large scale excavations, installation of the drainage using a pozidrain geocomposite, MOT Type 1X stone sub base, macadam engineered base and pcc kerb edgings.
  •  
  • A new fencing scheme consisting of 4.50m high standard bar fencing, 4.5m high twin bar fencing with rebound panel, 1.2m high spectator fencing including single and double leaf gates and 1 no. pitch divider.
  • A new floodlighting scheme of an eighteen column, 200 lux LED floodlights.
  • Additionally, new sets of football goals were erected to complete the installation, litter bins, boot wipers and a set of flags.