• The client on this project was Kirby Muxloe Sports and Social Club.
  • The area of the pitch was 7420m2 with a 50mm pile 3G sand/rubber filled carpet including line markings for Football.
  • All works were completed in a 14 week timescale.
  • Approximately, the project came to the value of £880,000.00+ VAT.
  • This was an upgrade from a natural turf stadium pitch to an artificial pitch.
  • A full construction was required including excavations, installation of the drainage via a pozidrain geocomposite, MOT Type 1X stone sub base, macadam engineered layer and kerbs.
  • A new fencing scheme consisting of 4.50m high standard bar fencing, 4.5m high twin bar fencing with rebound panel, 1.2m high spectator fencing, 1 no. 1.20m wide x 1.20m high single leaf gate, 1no. 1.20m wide x 4.5m high single leaf gate, 1 no. double leaf gate, and 1 no. pitch divider.
  •  
  • Additional netting was installed along the cricket boundary of up to 15m high.
  • A new floodlighting scheme of a 15m high, six column, LED 200 lux floodlighting scheme.
  • Additionally, new sets of football goals were erected to complete the installation, litter bins, boot wipers and a set of flags.